Why we draw at 1:5

Most of a project’s quality — and most of its cost overruns — are decided at junctions that never appear in a rendering.

6 min read

A rendering shows you a room. A 1:5 drawing shows you whether that room can actually be built for the number in your budget. The two are frequently in disagreement, and the disagreement is always resolved on site, at the worst possible moment, unless somebody has drawn it first.

Take a simple condition: where a lime-plastered wall meets a wide-plank oak floor. At 1:100 it is a line. At 1:5 it is a decision — shadow gap or skirting, how the plaster is stopped, what happens when the timber moves 3mm across a monsoon, and who is responsible for the sequencing. Four questions, each with a cost and a look attached.

We produce somewhere between forty and ninety of these drawings on a residential project. It is unglamorous work and it is the single clearest predictor of whether the finished house will look like the design.

Start Your Project

If you are planning somethingworth doing properly.

We take on six to eight commissions at a time and are currently in conversation about projects beginning next season. Tell us about the space, the timeline and what you are hoping it becomes — we reply to every serious enquiry within two working days.